Skip to content

OEM Jewelry Manufacturing: CAD Audit Before Tooling

A production mould is cut from the CAD file, so the file decides what the mould can and cannot make. That makes the 48-hour CAD stage a review gate rather than an admin step: dimensions, shrinkage allowance, stone seats and hallmark placement are audited before tooling is ordered. Catching a fault in the file costs two days; catching it after casting costs a 25–30 day resample and, often, a new mould.

Silver pendants in a suede polishing pouch
Finished silver pendants in a polishing pouch, the stage the audit is trying to protect.

Key takeaways

  • CAD is published at under 48 hours, roughly 6.7–8% of a 25–30 day sample window.
  • Six specification areas are locked by the file: material, plating, chains, stones, hallmarks and packaging.
  • A post-tooling correction adds 25–30 days before a corrected sample exists.
  • Final QC inspects 100% of pieces, so a file fault that survives reaches every unit.

A mould copies the file, including its mistakes

Casting reproduces geometry. A wall that is too thin in the CAD is too thin in the mould. A seat that is cut a tenth of a millimetre shallow stays shallow through every cycle of the tool.

There is a second layer of error that the file itself does not show: shrinkage. Metal contracts as it cools, so the tool is cut slightly larger than the finished part. If the allowance is wrong, the piece comes out undersized in every dimension at once.

This is why the audit happens before tooling and not after the first cast. Once steel is cut, the options narrow to polishing the cavity, re-cutting it within the existing block, or starting a new tool.

An OEM ODM jewelry manufacturer that runs a documented CAD review is not adding a step for its own sake. It is protecting the only stage where a change is still free.

The audit covers six specification areas

The review is easier to run as a checklist than as a conversation. Six areas cover almost every decision that tooling will freeze, and each one maps to a line in the quotation.

Material comes first, because it sets shrinkage and the plating route. Plating comes second, because a multi-layer finish needs clearance on edges and recesses. Chains and findings come third, since attachment geometry has to survive pull and movement.

Stones and accents come fourth: seat depth, girdle clearance and the setting method for natural stones or freshwater pearls. Hallmarks and logos come fifth, because laser engraving needs a flat area of a known depth. Packaging comes last, but a backing card with a fixed hole spacing constrains the bail long before the box is chosen.

Six specification areas, what the CAD audit locks in each, and where an unchecked error tends to appear (tttjewelry.com, read 28 Sept 2026).
AreaWhat the audit locksWhere an error surfaces
Base materialShrinkage allowance and castabilityUndersized or porous castings
Plating and finishEdge clearance, masking zonesThin coverage on rims
Chains and findingsAttachment geometry, movementFailed pull test at QC
Stones and accentsSeat depth, girdle clearanceLoose or high-set stones
Logo and hallmarksFlat area, engraving depthShallow or misplaced marks
PackagingBail size, card slot spacingPiece that will not sit on the card

Six rows, six chances to catch a problem while the fix is a line in a file.

Hallmarks, stone seats and findings need their own review

The hallmark is a legal mark as well as a design element. Silver carries S925, stainless carries 316L and gold-plated pieces carry 18KGP, and each has to sit where a laser can reach it without breaking a curve.

Stone seats deserve a separate pass because they combine two tolerances. The seat has to hold the girdle without crushing it, and the stone has to sit level in a polished surround. A seat designed on screen without a setting check is a frequent cause of a second sample.

Findings are the third specialist review. A bail, a jump ring or a clasp is a small part with a large mechanical job, and the audit should confirm that the attachment point is thick enough to survive routine wear.

ISO 9001:2015 supports this as a control point: the review is recorded, the revision is identified, and the signed file is the one that goes to tooling. A verbal approval over a chat message is not a revision.

Who signs, and what the signature freezes

In an OEM order the buyer owns the design and the CAD. The signature on the file is therefore the buyer's instruction to cut steel, and it should be treated with the seriousness of a purchase order. In an OEM/ODM programme the review is the third of the six published steps, and the signature is what authorises tooling.

In an ODM project the file is developed by the factory from the buyer's direction. The same rule applies at handover: the buyer signs the final geometry, and the exclusivity terms confirm that the file and the mould are not reused for another client.

What the signature freezes is precise. It fixes the geometry, the material, the plating route and the mark placement. It does not fix the surface finish, which is set at polishing, or the packing, which is set at the end of the line.

A short written record of what was approved, and what was deliberately left open, prevents the argument that tends to arrive with the first sample. It also makes a reorder faster, because the approved revision can be pulled rather than reconstructed.

Worked example

A buyer reviews three designs in one batch. At under 48 hours per file, sequential review would take 3 × 2 = 6 days; a single audit session covering all three takes 2 days and keeps the batch aligned for one sample cycle.

Suppose the audit catches one shallow stone seat. The correction is a file edit inside the 48-hour window. Without it, the first sample arrives with a high stone, and the corrected sample adds 25–30 days. That is 2 days of review against 25–30 days of rework, a return of 12.5–15 days of calendar for each day spent.

The same fault would also have reached production. With final QC inspecting 100% of pieces, a 300-piece order means 300 units carrying the defect to the packing table, and either a full rework or a scrapped run.

CAD is 48/720 = 6.7% to 48/600 = 8% of the sampling window. It is the smallest block in the schedule and the only one where a change is close to free.

Bar chart: Six customisation options on one order — what you can specify
Figures published on tttjewelry.com and read 28 Sept 2026, plotted as six customisation options on one order — what you can specify: Plating finish 2, Chains 3, Stones 4, Hallmarks 5, Packaging 6, Base material 1.

Frequently asked questions

What is checked in a CAD audit before tooling?

The file is checked for dimensions, shrinkage allowance, wall sections, stone seats, chain attachment points, hallmark placement and plating clearance before any mould is cut.

How long does the CAD stage take?

It is published at under 48 hours, which is about 8% of a 25-day sampling window and 6.7% of a 30-day one.

Can a mould be adjusted after it is cut?

A cut mould can only be polished or re-cut within its existing geometry, so a dimension change means a new mould and a fresh 25–30 day sample.

Running the audit as a habit

The audit works well as a fixed agenda with the same six headings on every project, because the checklist stops the review from drifting into a general design discussion.

The material route changes the detail. A silver programme needs the hallmark and anti-tarnish coating planned in the file, and a sterling silver jewelry manufacturer will usually ask for the S925 position before approving the model.

Stainless follows a different path, since PVD coating needs clearance for the vacuum chamber and the colour decision adds a run. A stainless steel jewelry manufacturer will want the palette fixed at the same gate, not after the first cast.

Two days of review is a small price against a 25–30 day sample, and it is the only point in the process where a change costs nothing but attention.

Source note: figures come from the manufacturer's own website (tttjewelry.com), read 28 Sept 2026.[1]